Wednesday, June 23, 2010

VICTORY LIFE--AND MORE WORK

The team met every day with renewed energy and tackled their work vigorously. The Tanzanians who worked alongside them admired their fortitude. The job was truly "manual labor". All the cement for the floor was hand mixed with sand and gravel and then carefully poured. After the first rough layer of cement was dried, a second layer was applied to smoothe out all the imperfections.

The ladies did their part too.....

Even the water had to be retrieved and hauled a distance.

No comments: